a division of Dorough Resources, LLC

 

 

 

News

Home

 

Services
News
Resume
Links

 

Current Activities

2006-07
DRS ENERGY MANAGEMENT is finalizing commissioning work on the new Whatcom Educational Credit Union (WECU) Loan Center, Bellingham.  This building incorporates a high-efficiency Underfloor Air Distribution System that is gaining popularity in commercial office design.  LEED Energy & Atmosphere Prerequisite 1 - Fundamental Building Systems Commissioning - and Credit 3 - Additional Commissioning - criteria are being followed as WECU is seeking LEED Gold Certification for this new building.  Other LEED Commissioning projects for 2007 will include two new WECU branch buildings, a new Community Food Co-op grocery store and the new Pickford Cinema.

2005
As a subconsultant to Engineering Economics, Inc, DRS ENERGY MANAGEMENT conducted Energy Modeling and Life Cycle Cost Analysis (LCCA) for a chiller replacement project at Lindeman Pavilion, Virginia Mason Hospital, Seattle.  DRS also performed the modeling and LCCA for the planned renovation of Newport High School, Bellevue, WA, and provided energy analysis for a large regional military facility. In early 2004 we developed a LEED certified Measurement and Verification (M&V) Plan for Marion Oliver McCaw Hall at Seattle Center.  Over the last two years, DRS performed the LCCA on the modernization of Interlake High School and Lake Hills Elementary School, also in Bellevue.  Simulation modeling was developed with the Trane Trace 700 program.  On all of the above school projects, standard State of Washington Department of General Administration procedures were followed to identify the mechanical, electrical and building envelope systems with the best life-cycle costs.

DRS has added the capability of receiving project drawings electronically in AutoCAD *.dwg and *.dwf and Adobe *.pdf formats.  This reduces client printing costs and expedites project execution.

Ongoing (2003--present)
DRS continues to conduct Washington State NREC plan reviews and inspections for the permitting and occupancy of a variety of commercial projects in the area.  Recent projects in Bellingham and the greater Whatcom County area include two distribution centers totalling 66,000 sf, a 19,000 sf manufacturing facility, a 15,000 sf pharmacy/retail store, a 31,000 sf medical arts center, an 11,000 sf branch bank building, a 12,000 sf office park expansion and a 17,000 sf light industrial building.  Energy design support has also been provided on numerous residential projects including a 253,000 sf 10 building multi-family complex in Pasco, WA, a 140,000 sf senior living complex in Mt Vernon and similar projects in Everett, Bremerton and Sequim.

Previous Highlights

Winter, 2002--03
Commissioning Agent for the new Lynden Library, Lynden, Washington:  Provided the full range of BCA recommended commissioning services, in keeping with the provisions of Washington State NREC "Simple Systems'" requirements.

Summer, 2002
Teamed up with United Energy Engineers (UEE) to perform the retro-commissioning of buildings at the Naval Support Complex at Smokey Point -- Marysville, Washington.  The commissioning of these buildings--approximately eight years of age--was partially sponsored by funding through Snohomish County PUD.

 

Copyright © 2002 Dorough Resources LLC